Conductor Cost Comparison
On this page
Define the comparison
Choose equal dimensions, equal DC resistance or another stated design requirement. Include conductor length, finished section, core and outer-layer metals, layer-ratio basis and resistance at the specified temperature.
Collect purchased quantities and costs
Provide the baseline and proposed material quantities and current supplier prices in the same currency. Add processing, scrap, coating, insulation, joining, packaging, tooling, qualification, freight and tax where they affect the decision.
Separate engineering and financial decisions
Check resistance, temperature rise, joints and mechanical requirements in the assembly. An emission comparison additionally needs traceable factors and a consistent assessment boundary.
Open the CCA Diameter Comparison for its stated models, or Send Your Cost-Comparison Inputs.
Compare the full production cost
Use current quotations and a consistent production boundary. Separate recurring costs from one-time investment, and credit recoverable scrap once.
| Cost record | Common basis and evidence |
|---|---|
| Functional output | Same accepted cable length or number of parts; installed role, material permission, target resistance/temperature and required cable tests |
| Quote identity | Supplier/grade/revision, price date/validity, currency, tax, delivery and trade terms for each option |
| Finished net material | Actual metallic area, density basis, wire/cable length factor and accepted output length; record kg/km separately from purchased mass |
| Purchased input | Material yield definition and period; purchased kg = accepted net kg ÷ yield where that process boundary is valid |
| Recoverable process scrap | Scrap quantity and separate dated recovery quote, collection cost and timing; credit once, not also as avoided input |
| Recurring processing | Drawing/forming, coating/insulation, joining, inspection, energy, labour and accepted-output yield |
| Packaging and destination | Reel/coil/core/net mass, packaging, freight, duty/tax and same delivery point |
| One-time transition | Tooling, qualification, trial scrap, downtime hours, training and temporary dual inventory |
| Period and cash | Approved comparison volume/time, inventory, payment and recovery timing; identify sunk costs separately |
| Engineering acceptance | Resistance, ampacity/temperature rise, fault duty, mechanical and joint validation are separate decisions |
| Source and decision | Quote/report references, assumptions, sensitivity inputs, reviewer, date and unresolved deviations |
For a cable-wire resistance and mass model, choose the actual LV neutral or MV metallic screen duty. Its calculated outputs remain separate from material guarantees and complete-cable approval.
Conductor cost comparison worksheet — open worksheet
Record your project requirements and observations, then download or include them in an inquiry.
| Item | Information / units | Your input |
|---|---|---|
| Comparison basis | Equal geometry / DC resistance / finished assembly; temperature and reference drawing | |
| Copper baseline | Grade, form, dimensions, conductivity and lay factor; source/version | |
| Candidate conductor | Material, layer-ratio basis, form, dimensions and conductivity; source/version | |
| Length and quantity | Cable length (m or km), annual or project quantity; state units | |
| Material price | Baseline and candidate prices; currency/kg, quote date and metal-price basis | |
| Processing | Conversion, coating, slitting, forming and joining costs; currency and quantity basis | |
| Yield and scrap | Utilization (%), scrap quantity and recovery credit; measured or quoted basis | |
| Packaging and logistics | Reel/coil, freight, duty and handling; currency and delivery basis | |
| Validation and tooling | Sample, trial, testing and one-time tooling costs; currency | |
| Recorded comparison | Mass, resistance and cost from the linked engineering tools or your approved model; state source/units |
Other formats and preview
Save or restore a draft
Drafts stay in this browser. Clear inputs also removes the saved draft.
Worksheet version: RT-RFQ-WORKSHEET-1.