Skip to main content
中文
Send an Inquiry

Engineering application guide

PV Ribbon for Your Module and Stringing Process

PV interconnect ribbon on the cell surface

Match the ribbon to the cell layout and stringing process. Specify interconnect or busbar duty, width and thickness, coating alloy, soldering conditions and spool format. For a composite-ribbon trial, compare joint quality and resistance in the actual module layout before setting the production specification.

Send Your Ribbon and Stringing Requirements
On this page
Interconnect ribbon crossing adjacent solar cells
Interconnect ribbon crossing adjacent solar cells
Round and flat PV ribbon cross-sections
Round and flat PV ribbon cross-sections
PV ribbon selection sheet (PDF)
PV ribbon selection sheet (PDF)

Locate each ribbon in the module

Where interconnect ribbons and busbar ribbons go in a PV module.
View full-size illustration

Scroll horizontally to read all columns. Keep the conditions and units with each value.

Position Current-path function Candidate product
Cell to cell Join metallized cell contacts into a string Composite interconnect ribbon
String to string / module connection Collect current through the busbar path Composite busbar ribbon
Round-wire cell layout Connect the specified cell contact arrangement Composite round solar ribbon

The copper-aluminum conductor and the solder coating perform separate jobs. Define the conductor structure and resistance first, then the coating alloy, thickness and the joining process for the cell metallization. Copper-base options remain a separate route in the PV ribbon range.

Check a candidate in three stages

  1. Material and line fit: verify the drawing dimensions, surface, coating and reel arrangement against the intended feed and stringing equipment.
  2. Representative joints: record wetting, alignment, peel behavior, resistance and cell inspection with material lots and process settings.
  3. Module evaluation: use the exact bill of materials and the project’s required thermal cycling, damp heat, EL and other qualification tests.

Compare candidates at the required resistance and module layout, including consumption and yield. A ribbon procurement-saving percentage uses the procurement cost of the ribbon being replaced as its denominator, not total module manufacturing cost.

PV Ribbon for Your Module and Stringing Process
Application specification record — open worksheet

Record your project requirements and observations, then download or include them in an inquiry.

ItemInformation / unitsYour input
Cell and current pathCell technology, contact layout, interconnect/busbar role and copper baseline
Conductor and coatingBare / finished section, layer basis, solder coating, temper and spool
Stringer and trialEquipment, temperature/time/speed/tension; peel/DCR/EL and module test records
Other formats and preview
Save or restore a draft

Drafts stay in this browser. Clear inputs also removes the saved draft.

Worksheet version: RT-RFQ-WORKSHEET-1.

RFQ Request Quote Discuss your specification WhatsApp
Request Quote WhatsApp