Write a Copper Strip Specification
A useful strip specification connects grade, temper and dimensions to stamping, bending, soldering or electrical duty. Define the surface and coil arrangement with the same care as the metal section.
On this page
Put the functional requirements on the drawing
Scroll horizontally to view all columns.
← Scroll horizontally to see all columns →
| Requirement group | What the specification should identify | Why it changes the supplied strip |
|---|---|---|
| Metal and condition | Grade, temper and required mechanical or electrical properties | Controls material selection and downstream forming |
| Section and edges | Thickness, width, tolerances, burr and edge shape | Determines die fit, bend quality and insulation clearance |
| Surface | Bare or coated, coated faces, cleanliness and finish | Affects contact, soldering and storage |
| Coil | Core, coil dimensions, winding direction and splice requirements | Matches feed equipment and traceability |
Select temper around the finished part
A strip that will be deeply formed has a different manufacturing requirement from a flat electrical link. Show the bend radius, direction relative to rolling, cutouts and the critical surface. Review cracking, springback and edge condition on a representative formed sample rather than choosing temper from a material name alone.
Keep bare and coated dimensions distinct
For bare strip, define the copper grade, thickness and surface. For tin-plated strip, also define tin thickness, the coated faces and any post-forming or solderability assessment. Keep the coating contribution separate where the finished envelope affects the fit.
Use copper strip for bare material and the tin-plated copper strip checklist when the surface participates in soldering or contact. The coating is part of the delivered construction, not a replacement for the copper grade or temper.
Agree measurements before the sample run
State where width, thickness, burr and flatness are measured and whether the values apply before or after forming. For electrical inspection, include the measurement length and temperature. For soldering, define the process and acceptance observation; for forming, identify the bend and failure criteria.
Send a drawing revision, expected quantity and coil arrangement together. These inputs allow the sample and quotation to describe the same strip, which is particularly important when comparing suppliers with different packaging or finishing assumptions.